Do you have any question about this error?
Message type: E = Error
Message class: E9 - General IS-U Error Messages
Message number: 057
Message text: Proration on &1 is not necessary
Proration for the transferred key date is not necessary because a time
slice begins on this date.
This message does not mean that an error has occurred.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
E9057
- Proration on &1 is not necessary ?The SAP error message E9057 "Proration on &1 is not necessary" typically occurs in the context of financial or controlling modules, particularly when dealing with allocations or distributions of costs or revenues. This message indicates that the system has determined that proration (the process of distributing amounts proportionally) is not needed for the specified object (denoted by &1).
Cause:
- No Relevant Data: The system may find that there are no relevant amounts to prorate for the specified object.
- Full Allocation: The amounts may already be fully allocated, making proration unnecessary.
- Configuration Issues: There may be configuration settings in the allocation or distribution process that lead to this message being triggered.
- Incorrect Parameters: The parameters or criteria set for the allocation may not require proration based on the current data.
Solution:
- Check Data: Review the data associated with the object in question to ensure that there are amounts that need to be prorated. If there are no amounts, then proration is indeed unnecessary.
- Review Allocation Rules: Examine the allocation or distribution rules configured in the system. Ensure that they are set up correctly and that proration is required based on the business logic.
- Adjust Parameters: If the parameters for the allocation process are incorrect, adjust them to ensure that proration is necessary when it should be.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on the allocation process and proration requirements.
- Testing: If changes are made, conduct tests to ensure that the error does not reoccur and that the allocation behaves as expected.
Related Information:
If the issue persists after checking the above points, it may be beneficial to consult with an SAP functional consultant who specializes in the relevant module to get more tailored assistance.
Get instant SAP help. Start your 7-day free trial now.
E9056
Proration on &1 is not permitted
What causes this issue? Due to a restriction, proration on the desired proration date is not permissible.System Response The system issues an error ...
E9055
Specify a proration day
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
E9058
Proration not permissible in a time slice gap
What causes this issue? You have attempted to prorate a time slice sequence for a date, for which a time slice does not exist. This is not possible.S...
E9059
Combination &1 &2 &3 not in table/view &4
What causes this issue? The specified combination does not exist in the table or view.System Response The system issues an error message and will no...
Click on this link to search all SAP messages.