How To Fix DPR_TASK030 - Cost/revenue rate for the task '&1' was reset


DPR_TASK030 - Overview

  • Message type: E = Error

  • Message class: DPR_TASK - Messages for Tasks

  • Message number: 030

  • Message text: Cost/revenue rate for the task '&1' was reset

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message DPR_TASK030 - Cost/revenue rate for the task '&1' was reset ?
    The SAP error message DPR_TASK030 indicates that the cost/revenue rate for a specific task has been reset. This typically occurs in the context of project management within SAP, particularly when using the SAP Project System (PS) or SAP Portfolio and Project Management (PPM) modules.
    
    Cause: Manual Reset: The cost/revenue rate may have been manually reset by a user, either intentionally or accidentally. Changes in Project Structure: If there are changes in the project structure or task assignments, it may lead to the resetting of rates. Data Consistency Issues: There may be inconsistencies in the data that trigger the system to reset the rates. Configuration Changes: Changes in configuration settings related to cost planning or revenue planning can also lead to this error. Integration Issues: If the task is integrated with other modules (like Controlling or Finance), issues in those areas can affect the rates.
    Solution: Check Task Settings: Review the settings for the specific task to ensure that

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker