How To Fix DPR_SHARED248 - Specified start &1 is outside the validity period of calendar &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: DPR_SHARED - Development Projects: Messages for Shared Objects

  • Message number: 248

  • Message text: Specified start &1 is outside the validity period of calendar &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message DPR_SHARED248 - Specified start &1 is outside the validity period of calendar &2 ?

    The SAP error message DPR_SHARED248 indicates that the specified start date for a project or task is outside the validity period of the associated calendar. This typically occurs in the context of project management within SAP, where specific calendars are defined for planning and scheduling purposes.

    Cause:

    1. Invalid Date Range: The start date you are trying to set for a project or task is not within the range defined by the calendar assigned to that project or task.
    2. Calendar Configuration: The calendar may have specific working days, holidays, or other constraints that limit the valid date range.
    3. Project Settings: The project or task may be linked to a calendar that has not been properly configured or has been changed after the project was created.

    Solution:

    1. Check Calendar Validity:

      • Go to the calendar settings in SAP and verify the validity period of the calendar assigned to the project or task.
      • Ensure that the start date you are trying to set falls within this validity period.
    2. Adjust Start Date:

      • If the start date is indeed outside the validity period, adjust the start date to a valid date that falls within the calendar's range.
    3. Modify Calendar Settings:

      • If necessary, you can modify the calendar settings to extend the validity period or create a new calendar that accommodates the required dates.
      • Ensure that the new or modified calendar is assigned to the project or task.
    4. Review Project Configuration:

      • Check the project configuration to ensure that the correct calendar is assigned and that there are no discrepancies in the project settings.
    5. Consult Documentation:

      • Refer to SAP documentation or help resources for more detailed guidance on managing calendars and project settings.

    Related Information:

    • Transaction Codes: You may need to use transaction codes like CALA (for calendar management) or CJ20N (for project management) to access the relevant settings.
    • User Roles: Ensure that you have the necessary permissions to modify calendar settings and project details.
    • SAP Notes: Check for any relevant SAP Notes that may address specific issues related to this error message or provide updates/fixes.

    By following these steps, you should be able to resolve the DPR_SHARED248 error and successfully set the desired start date for your project or task.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author