How To Fix DPR_SHARED248 - Specified start &1 is outside the validity period of calendar &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: DPR_SHARED - Development Projects: Messages for Shared Objects

  • Message number: 248

  • Message text: Specified start &1 is outside the validity period of calendar &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message DPR_SHARED248 - Specified start &1 is outside the validity period of calendar &2 ?
    The SAP error message DPR_SHARED248 indicates that the specified start date for a project or task is outside the validity period of the associated calendar. This typically occurs in the context of project management within SAP, where specific calendars are defined for planning and scheduling purposes.
    
    Cause: Invalid Date Range: The start date you are trying to set for a project or task is not within the range defined by the calendar assigned to that project or task. Calendar Configuration: The calendar may have specific working days, holidays, or other constraints that limit the valid date range. Project Settings: The project or task may be linked to a calendar that has not been properly configured or has been changed after the project was created.
    Solution: Check Calendar Validity: Go to the calendar settings in SAP and verify the validity period of the calendar assigned to the project or task. Ensure that the start date you are trying to

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant