How To Fix DPR_PROJECT062 - Project time frame has changed; check the roles


DPR_PROJECT062 - Overview

  • Message type: E = Error

  • Message class: DPR_PROJECT - Development Projects: Messages for Projects

  • Message number: 062

  • Message text: Project time frame has changed; check the roles

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message DPR_PROJECT062 - Project time frame has changed; check the roles ?
    The SAP error message DPR_PROJECT062 indicates that there has been a change in the time frame of a project, which may affect the roles assigned to that project. This error typically arises in the context of project management within SAP, particularly when using the SAP Project System (PS) or SAP Portfolio and Project Management (PPM) modules.
    
    Cause: Project Time Frame Change: The project’s start or end date has been modified, which can lead to inconsistencies with the roles assigned to the project. Role Assignment Issues: The roles that were previously assigned may no longer be valid due to the new time frame, or the roles may not cover the new project duration. Data Inconsistencies: There may be inconsistencies in the data related to the project, such as missing or incorrect role assignments.
    Solution: Check Project Dates: Review the project’s start and end dates to ensure they are set correctly. If they have been changed, verify that

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker