How To Fix DPR_PROJ_INTEGRATION248 - Object link not created for Portf. Mgmt proj. &1 with Microsoft Proj. &2


DPR_PROJ_INTEGRATION248 - Overview

  • Message type: E = Error

  • Message class: DPR_PROJ_INTEGRATION - Portf. Mgmt Integration Messages

  • Message number: 248

  • Message text: Object link not created for Portf. Mgmt proj. &1 with Microsoft Proj. &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message DPR_PROJ_INTEGRATION248 - Object link not created for Portf. Mgmt proj. &1 with Microsoft Proj. &2 ?
    The SAP error message DPR_PROJ_INTEGRATION248 indicates that there is an issue with the integration between SAP Portfolio Management (SAP PPM) and Microsoft Project. Specifically, it means that an object link could not be created for a Portfolio Management project when trying to integrate it with a Microsoft Project file.
    
    Cause: Project
    Configuration Issues: The project in SAP PPM may not be properly configured or may be missing required attributes that are necessary for integration with Microsoft Project. Missing or Incorrect Mapping: There may be issues with the mapping of fields between SAP PPM and Microsoft Project, leading to the inability to create the link. Authorization Issues: The user may not have the necessary authorizations to create links between the projects in SAP and Microsoft Project. Technical Issues: There could be technical issues such as network problems, incorrect settings in the integration configuration, or issues with the Microsoft Project installation.
    Solution: Check Project Configuration: Ensure that the project

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author