How To Fix DPR_PROJ_INTEGRATION247 - Object link created for Portf. Mgmt project &1 with Microsoft Project &2


DPR_PROJ_INTEGRATION247 - Overview

  • Message type: E = Error

  • Message class: DPR_PROJ_INTEGRATION - Portf. Mgmt Integration Messages

  • Message number: 247

  • Message text: Object link created for Portf. Mgmt project &1 with Microsoft Project &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


DPR_PROJ_INTEGRATION247 - Details

  • The SAP error message DPR_PROJ_INTEGRATION247 indicates that there is an issue with the integration between SAP Portfolio Management (SAP PPM) and Microsoft Project. This error typically arises when there is a problem with the object link created for a project in SAP PPM that is being integrated with Microsoft Project.
    
    Cause: Integration Issues: The error may occur due to a failure in the integration process between SAP PPM and Microsoft Project. This could be due to incorrect configuration settings or connectivity issues. Data Mismatch: There may be inconsistencies or mismatches in the project data between SAP and Microsoft Project, such as differences in project IDs or attributes. Permissions: The user may not have the necessary permissions to create or modify links between the two systems. Version Compatibility: There could be compatibility issues between the versions of SAP PPM and Microsoft Project being used.
    Solution: Check Configuration: Verify the integration settings between SAP PPM and Microsoft Project. Ensure

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


DPR_PROJ_INTEGRATION247 - Related SAP Errors