How To Fix DPR_PROJ_INTEGRATION214 - &1 &2 changed in Base Project System - &3 &4 will be updated


SAP Error Message - Details

  • Message type: E = Error

  • Message class: DPR_PROJ_INTEGRATION - Portf. Mgmt Integration Messages

  • Message number: 214

  • Message text: &1 &2 changed in Base Project System - &3 &4 will be updated

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message DPR_PROJ_INTEGRATION214 - &1 &2 changed in Base Project System - &3 &4 will be updated ?

    The SAP error message DPR_PROJ_INTEGRATION214 typically occurs in the context of project management within the SAP system, particularly when dealing with the integration of project-related data between different components, such as the Project System (PS) and the Project Management (DPR) modules.

    Cause:

    This error message indicates that there has been a change in the base project system (PS) data, which affects the project data in the Project Management (DPR) module. The message usually includes placeholders (&1, &2, &3, &4) that provide specific details about the changes and the affected project elements. The changes could be due to:

    1. Manual Updates: A user may have manually updated project data in the PS module.
    2. Data Synchronization Issues: There may be inconsistencies or synchronization issues between the PS and DPR modules.
    3. Configuration Changes: Changes in project configuration settings or structures that impact the integration between the two modules.

    Solution:

    To resolve this error, you can take the following steps:

    1. Review the Message Details: Check the specific details provided in the error message (the values of &1, &2, &3, &4) to understand what has changed and which project elements are affected.

    2. Check for Manual Changes: If the changes were made manually, verify if they were intended and if they align with the overall project management strategy.

    3. Data Consistency Check: Perform a consistency check between the PS and DPR modules to identify any discrepancies. This may involve running specific SAP reports or transactions designed to check data integrity.

    4. Reintegration: If necessary, reintegrate the project data between the PS and DPR modules. This may involve re-saving or re-activating the project in the DPR module to ensure it reflects the latest changes from the PS module.

    5. Consult Documentation: Refer to SAP documentation or notes related to the specific error message for additional guidance and troubleshooting steps.

    6. Contact SAP Support: If the issue persists and cannot be resolved through the above steps, consider reaching out to SAP support for further assistance.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N (Project Builder) and CJ02 (Change Project) to manage project data.
    • SAP Notes: Search for SAP Notes related to DPR_PROJ_INTEGRATION214 for any known issues or patches that may address the error.
    • User Roles and Authorizations: Ensure that users have the appropriate roles and authorizations to make changes in both the PS and DPR modules.

    By following these steps, you should be able to diagnose and resolve the error message effectively.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author