How To Fix DPR_PROJ_INTEGRATION213 - &1 &2 was deleted in base project system - &3 &4 will be deleted


SAP Error Message - Details

  • Message type: E = Error

  • Message class: DPR_PROJ_INTEGRATION - Portf. Mgmt Integration Messages

  • Message number: 213

  • Message text: &1 &2 was deleted in base project system - &3 &4 will be deleted

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message DPR_PROJ_INTEGRATION213 - &1 &2 was deleted in base project system - &3 &4 will be deleted ?
    The SAP error message DPR_PROJ_INTEGRATION213 indicates that a project element (such as a work package, task, or other project-related item) has been deleted in the base project system, and as a result, related elements in the project management system will also be deleted. This error typically arises in the context of SAP Project System (PS) or SAP Portfolio and Project Management (PPM) when there is a synchronization issue between the base project and its related components.
    
    Cause: Deletion in Base Project: The primary cause of this error is that an element in the base project (e.g., a work package or task) has been deleted. This could happen due to manual deletion or as part of a project restructuring. Data Consistency Issues: The system is trying to maintain data consistency between the base project and its related components. When an element is deleted in the base project, the system flags related elements for deletion

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker