Message type: E = Error
Message class: DPR_PROJ_INTEGRATION - Portf. Mgmt Integration Messages
Message number: 140
Message text: No project currency entered for project &1
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
DPR_PROJ_INTEGRATION140
- No project currency entered for project &1 ?The SAP error message DPR_PROJ_INTEGRATION140 indicates that there is no project currency entered for a specific project (denoted by
&1
). This error typically occurs in the context of project management within SAP, particularly when dealing with project-related transactions or integrations.Cause:
The primary cause of this error is that the project in question has not been assigned a currency. This can happen for several reasons:
- The project was created without specifying a currency.
- The currency settings were not properly configured during project creation.
- There may have been changes to the project settings that resulted in the currency being removed or not set.
Solution:
To resolve this error, you need to ensure that the project has a valid currency assigned. Here are the steps to do this:
Access the Project Definition:
- Go to the SAP Easy Access screen.
- Navigate to the Project Management module.
- Use transaction code
CJ20N
(Project Builder) orCJ02
(Change Project) to access the project.Check Project Currency:
- In the project details, look for the currency field. This is usually found in the project definition or in the project attributes.
- If the currency field is empty, you will need to enter a valid currency (e.g., USD, EUR).
Save Changes:
- After entering the currency, save the changes to the project.
Re-attempt the Transaction:
- Once the currency has been set, try to perform the transaction that previously resulted in the error.
Related Information:
If the issue persists after following these steps, it may be necessary to consult with your SAP support team or check for any specific configurations or customizations in your SAP environment that could be affecting project currency settings.
Get instant SAP help. Start your 7-day free trial now.
DPR_PROJ_INTEGRATION139
No entry in table &1 for &2 &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
DPR_PROJ_INTEGRATION138
Do not delete the record; change the availability to zero
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
DPR_PROJ_INTEGRATION141
Do not delete the record; change the location
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
DPR_PROJ_INTEGRATION142
Task status mapping undefined for WBS element &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...