DPR_PROJ_INTEGRATION071 - Planned start (Portf. Mgmt) &1, (PS) &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: DPR_PROJ_INTEGRATION - Portf. Mgmt Integration Messages

  • Message number: 071

  • Message text: Planned start (Portf. Mgmt) &1, (PS) &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message DPR_PROJ_INTEGRATION071 - Planned start (Portf. Mgmt) &1, (PS) &2 ?

    The SAP error message DPR_PROJ_INTEGRATION071 typically occurs in the context of project management, particularly when there is an inconsistency between the planned start dates in Portfolio Management (PM) and Project System (PS). This error indicates that the planned start date in the Portfolio Management system does not match the planned start date in the Project System.

    Cause:

    The error can arise due to several reasons:

    1. Data Inconsistency: The planned start date in the Portfolio Management module does not align with the planned start date in the Project System.
    2. Manual Changes: Changes made manually in either system without synchronizing the other can lead to discrepancies.
    3. Integration Issues: Problems in the integration settings between Portfolio Management and Project System can cause data not to be transferred correctly.
    4. Configuration Issues: Incorrect configuration settings in either module can lead to mismatches in data.

    Solution:

    To resolve this error, you can take the following steps:

    1. Check Dates: Verify the planned start dates in both the Portfolio Management and Project System. Ensure they are consistent.

      • Go to the relevant transaction codes (e.g., CJ20N for Project System) to check the planned start date.
      • Use transaction code DPR for Portfolio Management to check the planned start date.
    2. Synchronize Data: If you find discrepancies, update the planned start date in one of the systems to match the other. Ensure that the changes are reflected in both systems.

    3. Review Integration Settings: Check the integration settings between Portfolio Management and Project System to ensure they are correctly configured. This may involve reviewing the settings in transaction codes like SPRO (Customizing) to ensure that the integration is set up properly.

    4. Check for Manual Changes: If manual changes were made, consider implementing a process to ensure that changes in one system are communicated and reflected in the other.

    5. Consult Documentation: Refer to SAP documentation or notes related to this error message for any specific guidance or patches that may address the issue.

    6. Contact Support: If the issue persists after checking the above points, consider reaching out to SAP support for further assistance.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N (Project Builder), DPR (Portfolio Management), and SPRO (Customizing).
    • SAP Notes: Search for SAP Notes related to DPR_PROJ_INTEGRATION071 for any known issues or fixes.
    • User Roles: Ensure that users have the appropriate roles and authorizations to make changes in both systems.

    By following these steps, you should be able to identify and resolve the cause of the error message DPR_PROJ_INTEGRATION071.

    Artificial intelligence solution provided by tomco.ai.
    Disclaimer
    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Feature Free Access Free Trial
Basic SAP error explanation T-Code Explanation T-Code Explanation 2
Step-by-Step Usage Guide Step-by-Step Step-by-Step 2
Interactive SAP Coach Assistance Interactive SAP Interactive SAP 2
AI Troubleshooting for T-Code Errors AI Troubleshooting AI Troubleshooting 2

Related SAP Error Messages

Click the links below to see the following related messages:


SAP messages fall into 3 different categories: Error messages (message type = E), Warnings (W) or Informational (I) messages.

An error message will prevent you from continuing your work - it is a hard stop and you need to fix the error before you can proceed. A warning message will stop your work, however, you can then bypass the warning by pressing the Enter key on your keyboard. That said, it is still good practice to investigate the cause of the warning message and address it. An information message will not stop your work and is truly just for informational purposes.

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker