Do you have any question about this error?
Message type: E = Error
Message class: DPR_PROJ_INTEGRATION - Portf. Mgmt Integration Messages
Message number: 069
Message text: Priority (Portf. Mgmt) &1, (PS) &2
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
The SAP error message DPR_PROJ_INTEGRATION069 typically occurs in the context of project management and portfolio management within SAP. This error indicates that there is an issue with the integration between the Project System (PS) and the Portfolio Management (PM) module, specifically related to the priority of a project.
Cause:
The error message DPR_PROJ_INTEGRATION069 can be triggered by several factors, including:
- Missing or Incorrect Priority Assignment: The project may not have a priority assigned, or the assigned priority may not be valid or recognized by the system.
- Integration Issues: There may be a problem with the integration settings between the Project System and Portfolio Management modules.
- Data Inconsistencies: There could be inconsistencies in the data between the two modules, such as mismatched project IDs or missing entries in related tables.
- Configuration Issues: The configuration settings for project priorities in the system may not be set up correctly.
Solution:
To resolve the error DPR_PROJ_INTEGRATION069, you can take the following steps:
Check Project Priority:
- Navigate to the project in question and verify that a valid priority is assigned.
- If no priority is assigned, assign a valid priority to the project.
Review Integration Settings:
- Check the integration settings between the Project System and Portfolio Management to ensure they are correctly configured.
- Ensure that the necessary integration points are activated and functioning.
Data Consistency Check:
- Perform a data consistency check to identify any discrepancies between the Project System and Portfolio Management data.
- Use transaction codes like
SE11
to check the relevant database tables for inconsistencies.Configuration Review:
- Review the configuration settings for project priorities in the system. Ensure that the priority values are correctly defined in the configuration.
- You may need to consult with your SAP Basis or configuration team to ensure that everything is set up correctly.
Consult Documentation:
- Refer to SAP documentation or notes related to this error message for any specific guidance or patches that may be available.
Contact SAP Support:
- If the issue persists after checking the above points, consider reaching out to SAP support for further assistance. Provide them with the error message details and any relevant context to help them diagnose the issue.
Related Information:
CJ20N
(Project Builder), CJ01
(Create Work Breakdown Structure), and CVI
(Customer Vendor Integration) for managing projects and checking configurations.By following these steps, you should be able to identify and resolve the cause of the error message DPR_PROJ_INTEGRATION069.
Get instant SAP help. Start your 7-day free trial now.
Feature | Free Access | Free Trial |
---|---|---|
Basic SAP error explanation | ![]() |
![]() |
Step-by-Step Usage Guide | ![]() |
![]() |
Interactive SAP Coach Assistance | ![]() |
![]() |
AI Troubleshooting for T-Code Errors | ![]() |
![]() |
DPR_PROJ_INTEGRATION068 Location (Portf. Mgmt) &1, (PS) &2
Self-Explanatory Message Since SAP believes that this specific error message is ...
DPR_PROJ_INTEGRATION067 Description (Portf. Mgmt) &1, (PS) &2
Self-Explanatory Message Since SAP believes that this specific error message is ...
DPR_PROJ_INTEGRATION070 Milstone (Portf. Mgmt) No, (PS) Yes
Self-Explanatory Message Since SAP believes that this specific error message is ...
DPR_PROJ_INTEGRATION071 Planned start (Portf. Mgmt) &1, (PS) &2
Self-Explanatory Message Since SAP believes that this specific error message is ...
SAP messages fall into 3 different categories: Error messages
(message type = E), Warnings (W) or Informational (I) messages.
An error message will prevent you from continuing your work - it is a hard stop and you need to fix the error before you can proceed. A warning message will stop your work, however, you can then bypass the warning by pressing the Enter key on your keyboard. That said, it is still good practice to investigate the cause of the warning message and address it. An information message will not stop your work and is truly just for informational purposes.
Click on this link to search all SAP messages.