How To Fix DPR_PARTICIPANT130 - Period from & to & overlaps period from & to &


SAP Error Message - Details

  • Message type: E = Error

  • Message class: DPR_PARTICIPANT - Roles: Messages

  • Message number: 130

  • Message text: Period from & to & overlaps period from & to &

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message DPR_PARTICIPANT130 - Period from & to & overlaps period from & to & ?

    The SAP error message DPR_PARTICIPANT130 indicates that there is a conflict in the scheduling of periods for a participant in a project. Specifically, it means that the time period you are trying to assign to a participant overlaps with an existing time period that has already been assigned to that participant.

    Cause:

    1. Overlapping Time Periods: The most common cause of this error is that the start and end dates you are trying to assign to a participant overlap with another period that is already assigned to them.
    2. Incorrect Data Entry: There may be a mistake in the dates entered, leading to unintentional overlaps.
    3. Multiple Assignments: The participant may already be assigned to multiple tasks or roles that have overlapping time frames.

    Solution:

    1. Check Existing Assignments: Review the current assignments for the participant in the project. Look for any overlapping periods that may be causing the conflict.
    2. Adjust Dates: Modify the start and end dates of the new assignment to ensure they do not overlap with existing assignments.
    3. Reassign Tasks: If necessary, consider reassigning tasks to different participants or adjusting the project schedule to eliminate the overlap.
    4. Consult Project Management: If you are unsure about how to resolve the conflict, consult with your project manager or team lead for guidance on how to proceed.

    Related Information:

    • Transaction Codes: You may need to use transaction codes like DPR (Project Management) to access the relevant project and participant details.
    • Documentation: Refer to SAP documentation or help files for more information on managing project participants and scheduling.
    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional troubleshooting steps.

    By following these steps, you should be able to resolve the DPR_PARTICIPANT130 error and successfully assign the participant to the desired time period.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant