How To Fix DPR_PARTICIPANT129 - Weekly calculation basis is not suitable for monthly assignment


DPR_PARTICIPANT129 - Overview

  • Message type: E = Error

  • Message class: DPR_PARTICIPANT - Roles: Messages

  • Message number: 129

  • Message text: Weekly calculation basis is not suitable for monthly assignment

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


DPR_PARTICIPANT129 - Details

  • The SAP error message DPR_PARTICIPANT129 indicates that there is an issue with the assignment of a participant in a project, specifically related to the calculation basis for weekly and monthly assignments. This error typically arises in the context of project management within SAP, particularly when dealing with resource planning and assignments.
    
    Cause: The error occurs when there is a mismatch between the frequency of the assignment (weekly) and the type of calculation basis (monthly) that is being used. This can happen in scenarios where: A participant is assigned to a project with a weekly calculation basis, but the project or the resource planning settings expect a monthly calculation basis. The settings for the project or the resource do not align with the expected frequency of the assignment.
    Solution: To resolve the error DPR_PARTICIPANT129, you can take the following steps: Check Assignment Frequency: Review the assignment frequency of the participant in the project. Ensure that it matches the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


DPR_PARTICIPANT129 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker