How To Fix DPR_PARTICIPANT115 - Distribution values are outside the validity interval


DPR_PARTICIPANT115 - Overview

  • Message type: E = Error

  • Message class: DPR_PARTICIPANT - Roles: Messages

  • Message number: 115

  • Message text: Distribution values are outside the validity interval

  • Show details Hide details
  • What causes this issue?

    You cannot change the start or finish of the role or of the role
    staffing because values have already been entered in the distribution
    table that is outside the new timeframe.
    You cannot change or set a distribution interval because the new time
    frame would be outside of the start and finish of the role.

    System Response

    You cannot save your changes.

    How to fix this error?

    Enter a valid interval for the time frame of the role or role staffing
    or set the appropriate distribution values to zero.
    Enter a valid interval for the distribution of the role.

    Procedure for System Administrators

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.


    Error message extract from SAP system. Copyright SAP SE.


DPR_PARTICIPANT115 - Details

  • The SAP error message DPR_PARTICIPANT115 indicates that the distribution values you are trying to enter or process are outside the defined validity interval for a particular project or activity. This typically occurs in the context of project management within SAP, particularly when dealing with project planning and budgeting.
    
    Cause: Invalid Distribution Values: The values you are trying to assign to a project or activity may not fall within the allowed range or validity period defined in the system. Incorrect Validity Period: The validity period for the distribution values may not be set correctly, or the values may have been defined for a different time frame. Project Status: The project or activity may be in a status that does not allow for changes to distribution values.
    Configuration Issues: There may be configuration settings in the project management module that restrict the distribution values.
    Solution: Check Validity Period: Review the validity period for the distribution values you are trying

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


DPR_PARTICIPANT115 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant