How To Fix DPR_PARTICIPANT105 - No working days between start and finish


SAP Error Message - Details

  • Message type: E = Error

  • Message class: DPR_PARTICIPANT - Roles: Messages

  • Message number: 105

  • Message text: No working days between start and finish

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message DPR_PARTICIPANT105 - No working days between start and finish ?

    The SAP error message DPR_PARTICIPANT105, which states "No working days between start and finish," typically occurs in the context of project management within SAP, particularly when dealing with project planning and scheduling in the SAP Project System (PS) or SAP Portfolio and Project Management (PPM).

    Cause:

    This error usually arises when:

    1. Date Configuration: The start and finish dates of a task or project are set in such a way that there are no valid working days between them. This can happen if:
      • The start date is set after the finish date.
      • The dates fall on non-working days (e.g., weekends, holidays) and there are no working days in between.
    2. Calendar Settings: The project or task may be linked to a calendar that does not have any working days defined for the specified period.
    3. Task Duration: The duration of the task is set to zero or negative, which can lead to this error.

    Solution:

    To resolve the error, you can take the following steps:

    1. Check Dates:

      • Verify the start and finish dates of the task or project. Ensure that the start date is earlier than the finish date.
      • Adjust the dates if necessary to ensure that they are valid.
    2. Review Working Days:

      • Check the calendar settings associated with the project or task. Ensure that the calendar has defined working days for the period in question.
      • If the project is linked to a specific work calendar, ensure that it includes the necessary working days.
    3. Adjust Task Duration:

      • If the task duration is set to zero or negative, adjust it to a positive value that reflects the actual time required to complete the task.
    4. Use the Correct Calendar:

      • If the project is using a specific calendar, ensure that it is the correct one for the project’s location and working conditions.
    5. Consult with Project Management:

      • If you are unsure about the correct settings, consult with your project management team or SAP administrator to ensure that the project settings align with organizational policies.

    Related Information:

    • SAP Documentation: Refer to the official SAP documentation for detailed information on project planning and scheduling.
    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N (Project Builder) or CProject (Project Management) to manage project details effectively.
    • SAP Notes: Check for any SAP Notes related to this error message for additional insights or patches that may address the issue.

    By following these steps, you should be able to resolve the DPR_PARTICIPANT105 error and ensure that your project scheduling is set up correctly.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant