How To Fix DPR_FIN_GECCO007 - The project does not have any elements to be costed


DPR_FIN_GECCO007 - Overview

  • Message type: E = Error

  • Message class: DPR_FIN_GECCO - Messages for Accounting Integration

  • Message number: 007

  • Message text: The project does not have any elements to be costed

  • Show details Hide details
  • What causes this issue?

    The following elements are selected from the project for costing:
    <ZK>Project participants or roles</>
    <ZK>Resources or staffings</>
    <ZK>Tasks</>
    <ZK>Role-task links</>
    An element is only relevant to costing if demand or work is planned for
    it.

    System Response

    The system could not find an element relevant to costing.

    How to fix this error?

    Check the elements potentially relevant to costing in the project and
    plan the work or required capacity.
    Note that depending on the controlling scenario used, the project data
    is selected in different ways. The project data selection is divided
    into project element-oriented controlling scenarios and role-based
    controlling scenarios. You decide which scenario is to be used via the
    project type. If, for example, you only want to carry out costing for
    project elements in a project but have set up a role-based controlling
    scenario via the project type, the system does not determine any
    costing-relevant data.

    Procedure for System Administrators

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.


    Error message extract from SAP system. Copyright SAP SE.


DPR_FIN_GECCO007 - Details

  • The SAP error message DPR_FIN_GECCO007, which states "The project does not have any elements to be costed," typically occurs in the context of project management and financial accounting within SAP. This error indicates that the system cannot find any cost elements associated with the project for the purpose of cost calculation or reporting.
    Causes:
    
    No Cost Elements Assigned: The project may not have any cost elements (such as activities, work packages, or other cost-related items) assigned to it.
    Inactive Project: The project might be in an inactive status, preventing any cost calculations.
    Missing Master Data: Required master data (like cost centers, internal orders, or WBS elements) may not be set up or linked correctly.
    Project Structure Issues: The project structure may not be properly defined, leading to a lack of cost-related elements.
    Incorrect Project Type: The project type may not support cost elements or may not be configured correctly.
    
    Solutions:
    
    Check Project Structure: Review the project structure to

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


DPR_FIN_GECCO007 - Related SAP Errors