How To Fix DPR_FIN_GECCO006 - The project is unknown in Accounting


DPR_FIN_GECCO006 - Overview

  • Message type: E = Error

  • Message class: DPR_FIN_GECCO - Messages for Accounting Integration

  • Message number: 006

  • Message text: The project is unknown in Accounting

  • Show details Hide details
  • What causes this issue?

    The project was not transferred to the Accounting system yet. Possible
    causes are:
    An error occurred during replication.
    There was a time lag between the time when the project was saved and
    when the cost collector was created in Controlling.
    It is also possible that the Accounting system is not available at this
    time. This is indicated by the corresponding error message in the log.

    System Response

    The system could not provide any data or functions in the Accounting
    system.

    How to fix this error?

    Recheck whether the Accounting system has recognized the project in the
    meantime.
    Use the Controlling Cockpit to analyze errors that could have occurred
    when transferring the project and correct them. Then create the cost
    collector in the Controlling Cockpit again.
    If you cannot create the project in the Controlling Cockpit again,
    rereplicate the project by setting the status <LS>Flag for Replication
    </> for the project definition in Project Management .
    If you are still unable to correct the error even after carrying out
    these steps, contact your system administrator.

    Procedure for System Administrators

    If the Accounting system is not currently available, correct the cause
    of this.
    Once the Accounting system is available note the following:
    The transfer of the project to the Accounting system is done per qRFC
    (queued Remote Function Call). This technique ensures that the transfer
    occurrs sequentially. However, if an error occurs in the target system,
    the system does not continue to transfer and the queue hangs.
    It is also possible that an error occurred when the project was
    transferred. Use the transaction SMQ1 to analyze the queue <LB>
    CPROJECTS_FIN_GECCO</>. With this transaction you can display the queue
    status and restart it once the cause of the error has been found and
    corrected.
    You can also delete LUWs (Logical Units of Work) belonging to this
    queue. However, note that this transfer is lost and you must retransfer
    the project belonging to this LUW.

    Error message extract from SAP system. Copyright SAP SE.


DPR_FIN_GECCO006 - Details

  • The SAP error message DPR_FIN_GECCO006, which states "The project is unknown in Accounting," typically occurs in the context of project management and financial accounting within the SAP system. This error indicates that the system cannot find the specified project in the accounting database, which can happen for several reasons.
    Causes:
    
    Project Not Created: The project may not have been created in the system or may not exist in the specified controlling area.
    Incorrect Project ID: The project ID entered may be incorrect or misspelled.
    Project Status: The project might be in a status that does not allow it to be used in accounting (e.g., it may be closed or archived).
    Authorization Issues: The user may not have the necessary authorizations to access the project in the accounting module.
    Data Synchronization Issues: There may be a delay or issue in data synchronization between different modules (e.g., Project System and Controlling).
    
    Solutions:
    
    Verify Project Existence: Check if the project exists

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


DPR_FIN_GECCO006 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author