Do you have any question about this error?
Message type: E = Error
Message class: DPR_CALC - cProjects Costing Integration
Message number: 040
Message text: Ctrarea &1: Activity type &2 (fr.&3) does not contain an alloctn cost el.
In the controlling area specified, the master record of the activity
type (from the cost/revenue rate) does not contain an allocation cost
element for the allocation.
DPR_CALC 040
Assign an allocation cost element to the master record of the activity
type.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
DPR_CALC040
- Ctrarea &1: Activity type &2 (fr.&3) does not contain an alloctn cost el. ?The SAP error message DPR_CALC040 indicates that there is an issue with the allocation of costs for a specific activity type in a project. This error typically arises in the context of project management and resource planning within SAP, particularly when dealing with project definitions and activity types.
Cause:
The error message "Ctrarea &1: Activity type &2 (fr.&3) does not contain an allocation cost element" suggests that the specified activity type does not have a valid cost element assigned for allocation. This can occur due to several reasons:
- Missing Cost Element: The activity type may not have a cost element defined in the system, which is necessary for cost allocation.
- Incorrect Configuration: The configuration for the activity type may be incomplete or incorrect, leading to the absence of a cost element.
- Project Structure Issues: The project structure may not be set up correctly, causing the system to not recognize the cost element for the activity type.
- Authorization Issues: There may be authorization issues preventing the system from accessing the cost element.
Solution:
To resolve the error DPR_CALC040, you can take the following steps:
Check Activity Type Configuration:
- Go to the configuration settings for the activity type in SAP (Transaction code: OAYD or similar).
- Ensure that the activity type has a valid allocation cost element assigned.
Assign Cost Element:
- If the cost element is missing, you will need to assign a valid cost element to the activity type.
- This can typically be done in the activity type configuration settings.
Review Project Definition:
- Check the project definition and ensure that all necessary components, including activity types and cost elements, are correctly defined.
- Make sure that the project structure is complete and correctly set up.
Check Authorizations:
- Verify that you have the necessary authorizations to access and modify the cost elements and activity types.
Consult Documentation:
- Refer to SAP documentation or help resources for specific guidance on configuring activity types and cost elements.
Contact SAP Support:
- If the issue persists after checking the above points, consider reaching out to SAP support for further assistance.
Related Information:
By following these steps, you should be able to identify and resolve the cause of the DPR_CALC040 error in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
DPR_CALC039
PS project &1 for the project &2 is currently locked
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
DPR_CALC038
Rollback: Account assignment must be reset
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
DPR_CALC041
Internal order &1 for project &2: Costing cannot be deleted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
DPR_CALC100
Execute test run
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.