Message type: E = Error
Message class: DPR_CALC - cProjects Costing Integration
Message number: 039
Message text: PS project &1 for the project &2 is currently locked
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
DPR_CALC039
- PS project &1 for the project &2 is currently locked ?The SAP error message DPR_CALC039 indicates that a project (identified by the project number &2) is currently locked, which prevents certain operations from being performed on it. This error typically occurs in the context of Project System (PS) and Project Management (DPR) modules when a user attempts to perform actions such as planning, budgeting, or executing transactions on a project that is locked for processing.
Cause: Locking Mechanism: The project may be locked due to ongoing processes, such as calculations, planning activities, or other transactions being executed by another user or system process. User Lock: A specific user may have locked the project for their own operations, preventing others from making changes. System Lock: The system may have a lock in place due to background jobs or batch processes that are currently running and affecting the project. Error in Previous Transactions: If a previous transaction did not complete successfully, it might leave the project in
Get instant SAP help. Sign up for our Free Essentials Plan.
DPR_CALC038
Rollback: Account assignment must be reset
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
DPR_CALC037
Cost element &1 in the controlling area &2 does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
DPR_CALC040
Ctrarea &1: Activity type &2 (fr.&3) does not contain an alloctn cost el.
What causes this issue? In the controlling area specified, the master record of the activity type (from the cost/revenue rate) does not contain an al...
DPR_CALC041
Internal order &1 for project &2: Costing cannot be deleted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.