How To Fix DPR_CALC030 - No account assignment exists for the project definition - no costing


SAP Error Message - Details

  • Message type: E = Error

  • Message class: DPR_CALC - cProjects Costing Integration

  • Message number: 030

  • Message text: No account assignment exists for the project definition - no costing

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message DPR_CALC030 - No account assignment exists for the project definition - no costing ?

    The SAP error message DPR_CALC030 indicates that there is no account assignment for the specified project definition, which prevents the system from performing cost calculations. This error typically arises in the context of project management and controlling within SAP, particularly when dealing with project definitions in the Project System (PS) or Project Management (PM) modules.

    Cause:

    1. Missing Account Assignment: The project definition does not have a valid account assignment. This means that the system cannot determine where to post costs related to the project.
    2. Incorrect Project Definition: The project definition may not be properly set up or may be missing necessary configurations.
    3. Inactive or Incorrect Status: The project might be in a status that does not allow for cost calculations or postings.
    4. Missing Master Data: Required master data (like cost centers, internal orders, or WBS elements) may not be assigned to the project.

    Solution:

    1. Check Project Definition:

      • Go to the project definition in the SAP system and verify that all necessary account assignments are correctly set up.
      • Ensure that the project definition is active and in a status that allows for cost calculations.
    2. Assign Account Assignment:

      • If the project definition is missing account assignments, you can assign the necessary cost centers, internal orders, or other relevant account assignments through the project definition settings.
    3. Review Master Data:

      • Ensure that all required master data is created and correctly linked to the project. This includes checking for valid cost centers, internal orders, and WBS elements.
    4. Check Configuration:

      • Review the configuration settings in the Project System to ensure that they are set up correctly for the type of project you are working with.
    5. Consult Documentation:

      • Refer to SAP documentation or help resources for specific guidance on setting up project definitions and account assignments.
    6. Contact Support:

      • If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.

    Related Information:

    • Transaction Codes: You may use transaction codes like CJ20N (Project Builder) or CJ02 (Change Project) to access and modify project definitions.
    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional troubleshooting steps.
    • User Roles and Authorizations: Ensure that you have the necessary authorizations to view and modify project definitions and account assignments.

    By following these steps, you should be able to resolve the DPR_CALC030 error and ensure that your project definitions are correctly set up for cost calculations.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author