How To Fix CY540 - No requirements in evaluation period were found


CY540 - Overview

  • Message type: E = Error

  • Message class: CY - Capacity Requirements Planning

  • Message number: 540

  • Message text: No requirements in evaluation period were found

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CY540 - No requirements in evaluation period were found ?
    The SAP error message CY540: No requirements in evaluation period were found typically occurs in the context of capacity planning and production planning within the SAP system. This error indicates that the system could not find any requirements (such as production orders, planned orders, or purchase requisitions) for the specified evaluation period when trying to analyze capacity.
    Causes:
    
    No Planned Orders or Production Orders: There may be no planned orders or production orders created for the material in the specified time frame.
    Incorrect Evaluation Period: The evaluation period specified in the planning run may not align with the periods where requirements exist.
    Selection Criteria: The selection criteria used in the planning run may be too restrictive, filtering out all the requirements.
    Material Master Data: The material may not be set up correctly in the material master, or it may not be assigned to a valid production version.
    Capacity Planning Settings: The settings for capacity planning may

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker