Do you have any question about this error?
Message type: E = Error
Message class: CY - Capacity Requirements Planning
Message number: 507
Message text: Work center is not loaded in the planning table. Resched. not possible
You are trying to dispatch an operation to another work center. However,
when you entered the planning table (tabular form) you did not select
the work center to which you want to dispatch the operation.
You should call up the planning table (tabular form) again and select
the work center to which you want to dispatch the operation either
directly or via the relevant order.
Error message extract from SAP system. Copyright SAP SE.
CY507
- Work center is not loaded in the planning table. Resched. not possible ?The SAP error message CY507: Work center is not loaded in the planning table. Rescheduling not possible typically occurs in the context of production planning and scheduling within SAP. This error indicates that the work center you are trying to reschedule does not have any planned orders or operations loaded into the planning table, which prevents any rescheduling actions.
Causes:
- No Planned Orders: The work center may not have any planned orders or production orders assigned to it.
- Incorrect Planning Table: The planning table you are viewing may not be set up to display the relevant work center or may be filtered incorrectly.
- Capacity Issues: The work center may be set up with capacity constraints that prevent it from being loaded.
- Date Range: The date range you are looking at may not include any operations for the work center.
- Configuration Issues: There may be configuration issues in the work center settings or in the planning parameters.
Solutions:
- Check Planned Orders: Verify that there are planned orders or production orders assigned to the work center. If there are none, you will need to create them.
- Adjust Filters: Ensure that the filters in the planning table are set correctly to include the work center you are trying to reschedule.
- Review Capacity Settings: Check the capacity settings for the work center to ensure that it is properly configured and has available capacity.
- Change Date Range: Adjust the date range in the planning table to ensure it includes the relevant operations for the work center.
- Re-evaluate Planning Parameters: Review the planning parameters and settings in the configuration to ensure they are set up correctly for the work center.
- Use Alternative Planning Tools: If the planning table is not providing the necessary information, consider using other planning tools or reports in SAP to analyze the work center's load.
Related Information:
CM01
(Capacity Planning) or CM21
(Capacity Leveling) to analyze the work center's load.CR01
or CR02
to ensure it is set up correctly.If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning.
Get instant SAP help. Start your 7-day free trial now.
CY506
Please choose a period for display of individual elements
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CY505
No group indicated as heading group in layout & chart &
What causes this issue? No group was selected as the heading for the display to layout ID &V1& for the chart &V2&.How to fix this err...
CY508
Place the cursor on a requirements line or work center
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CY509
No requirements elements have been selected
What causes this issue? You have called up a function for which at least one requirements line must be selected. However you have not selected a line...
Click on this link to search all SAP messages.