Message type: E = Error
Message class: CY - Capacity Requirements Planning
Message number: 421
Message text: The capacity requirements are already split
You are trying to allocate a capacity requirement directly to an
individual capacity. With this capacity requirement you are not dealing
with a split; however, the requirement has already been split.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
You can only allocate a capacity requirement directly to an individualThe allocation is terminated.
If you want to split or allocate a capacity requirement you can do this
on the dialog box "Split/allocate".
Error message extract from SAP system. Copyright SAP SE.
CY421
- The capacity requirements are already split ?The SAP error message CY421 ("The capacity requirements are already split") typically occurs in the context of capacity planning and production scheduling within SAP's Production Planning (PP) module. This error indicates that the system has detected that the capacity requirements for a particular operation or resource have already been split, and it cannot be split again.
Cause:
Capacity Splitting: The error arises when there is an attempt to split capacity requirements that have already been split. This can happen if:
- You are trying to re-schedule or re-plan an operation that has already been split into multiple segments.
- There are conflicting settings or configurations in the production order or routing that prevent further splitting.
Resource Configuration: The configuration of the resources or work centers may not allow for further splitting due to specific settings in the capacity planning parameters.
Order Status: The status of the production order may also play a role. If the order is in a status that does not allow for changes, this error may occur.
Solution:
Check Capacity Requirements: Review the capacity requirements for the operation in question. Ensure that you are not attempting to split an already split requirement.
Review Production Order: Check the production order and its status. If the order is already released or in a status that does not allow changes, you may need to adjust the order status or create a new order.
Adjust Settings: If the splitting is necessary, review the configuration settings for the work center or resource. You may need to adjust the parameters that control capacity splitting.
Use Alternative Methods: If splitting is not possible, consider using alternative methods for scheduling or capacity planning, such as adjusting the production order quantities or changing the scheduling parameters.
Consult Documentation: Refer to SAP documentation or help resources for specific guidance on capacity planning and splitting requirements.
Contact SAP Support: If the issue persists and you cannot find a resolution, consider reaching out to SAP support for assistance. They can provide insights based on your specific system configuration and version.
Related Information:
By following these steps, you should be able to diagnose and resolve the CY421 error in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
CY420
Phases cannot be dispatched or deallocated
What causes this issue? Currently you cannot dispatch phases directly.How to fix this error? If you want to dispatch or deallocate phases, dispatch ...
CY419
You should either enter a group 0 or groups not equal to 0
What causes this issue? You have made entries both with the group 0 as well as with one or more groups not equal to 0. However this is not possible.H...
CY422
Person not valid at given point in time
What causes this issue? The person is not working at the work center at the date selected.How to fix this error? Choose another date.Error message e...
CY423
Error when scheduling split &
What causes this issue? While trying to schedule split number & an error arose. A possible cause of the error is the non-availability of the pers...