Message type: E = Error
Message class: CY - Capacity Requirements Planning
Message number: 410
Message text: The quantity of all the splits is greater than the operation quantity
You have carried out a quantity split for a capacity requirement.
The sum of the quantity to be processed by the individual splits is
greater than the quantity in the operation.
You should check your entries.
Error message extract from SAP system. Copyright SAP SE.
CY410
- The quantity of all the splits is greater than the operation quantity ?The SAP error message CY410 ("The quantity of all the splits is greater than the operation quantity") typically occurs in the context of production planning and control, particularly when dealing with operations in a production order or a process order. This error indicates that the total quantity of components or splits that have been assigned to an operation exceeds the quantity that is actually available for that operation.
Cause:
- Excessive Splits: The total quantity of all the splits (sub-operations or components) assigned to a particular operation exceeds the operation's defined quantity.
- Incorrect Data Entry: There may have been an error in data entry when creating or modifying the production order, leading to an incorrect total quantity.
- Configuration Issues: There may be issues with the configuration of the routing or bill of materials (BOM) that define the operation and its components.
- Changes in Production Order: If the production order was modified after splits were created, it could lead to discrepancies in quantities.
Solution:
- Review Operation Quantities: Check the operation quantities in the production order to ensure they are set correctly. Make sure that the total quantity of splits does not exceed the operation quantity.
- Adjust Splits: If the splits are indeed greater than the operation quantity, you will need to adjust the splits to ensure they are within the allowable limits. This may involve reducing the quantity of one or more splits.
- Check BOM and Routing: Verify the bill of materials and routing for the production order to ensure that they are correctly defined and that the quantities match the intended production.
- Recreate Splits: If necessary, delete the existing splits and recreate them with the correct quantities that align with the operation quantity.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on handling splits and operations in your version of SAP.
Related Information:
If the problem persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning and control.
Get instant SAP help. Start your 7-day free trial now.
CY409
You cannot dispatch to the work center entered
What causes this issue? You have entered a work center to which the selected operations are to be dispatched. However, the work center is not in the ...
CY408
The status "dispatched" cannot be set
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CY411
The work of all the splits is greater than the work in the operation
What causes this issue? You have split the work of some capacity requirements. The sum of the work in the individual splits is greater that the work ...
CY412
The individual capacity does not belong to the capacity
What causes this issue? You are trying to assign a split to an individual capacity that does not belong to the capacity where the capacity requiremen...