Do you have any question about this error?
Message type: E = Error
Message class: CY - Capacity Requirements Planning
Message number: 350
Message text: Order &/&: No start date given
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CY350
- Order &/&: No start date given ?The SAP error message CY350 ("Order &/&: No start date given") typically occurs in the context of production planning and control, particularly when dealing with production orders or process orders. This error indicates that the system is unable to process the order because a required start date has not been provided.
Cause:
- Missing Start Date: The most common cause of this error is that the start date for the order has not been entered or is missing in the order details.
- Incorrect Order Type: Certain order types may require specific fields to be filled out, including the start date.
- Data Entry Error: There may have been an oversight during data entry, leading to the omission of the start date.
- Configuration Issues: In some cases, the configuration settings for the order type may not be set up correctly, leading to mandatory fields not being enforced.
Solution:
- Enter Start Date: Go to the order in question and ensure that the start date is filled in. This can typically be done in the order details screen.
- Check Order Type Configuration: Review the configuration settings for the order type in transaction code OPL8 (for production orders) or OPU1 (for process orders) to ensure that the start date is marked as a mandatory field if required.
- Review User Input: If the order was created through a program or interface, check the input data to ensure that the start date is being passed correctly.
- Consult Documentation: If the issue persists, refer to SAP documentation or consult with your SAP support team for further troubleshooting.
Related Information:
If the problem continues after following these steps, it may be beneficial to engage with your SAP support team or consult the SAP community for more specific guidance based on your system configuration and version.
Get instant SAP help. Start your 7-day free trial now.
CY349
The work center & in plant & has a deletion flag
What causes this issue? You are trying to dispatch capacity requirements to work center &V1& in plant &V2&. However a deletion flag i...
CY348
The work center & in plant & is locked
What causes this issue? You are trying to dispatch the capacity requiements to the work center &V1& in plant &V2&. However this work ...
CY351
The planning period does not lie within the database reading period
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CY352
The planning period does not lie within the evaluation period
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.