Black Friday is ending this Friday! 40% off with coupon CYBER40 - Sign up here

Close

How To Fix CY352 - The planning period does not lie within the evaluation period


CY352 - Overview

  • Message type: E = Error

  • Message class: CY - Capacity Requirements Planning

  • Message number: 352

  • Message text: The planning period does not lie within the evaluation period

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


CY352 - Details

  • The SAP error message CY352, "The planning period does not lie within the evaluation period," typically occurs in the context of planning and budgeting processes within SAP, particularly in modules like SAP Controlling (CO) or SAP Integrated Business Planning (IBP). This error indicates that the planning period you are trying to use does not fall within the defined evaluation period for the planning scenario.
    
    Cause: Mismatch of Dates: The planning period you are trying to use is outside the range of the evaluation period defined in the planning settings. Incorrect Configuration: The configuration settings for the planning version or the planning layout may not align with the periods you are trying to evaluate. Period Locking: The periods may be locked for planning, preventing any changes or entries outside the defined evaluation period. Version Control: The planning version you are using may not be set up to allow planning for the specified periods.
    Solution: Check Planning Period: Verify

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


CY352 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker