Do you have any question about this error?
Message type: E = Error
Message class: CY - Capacity Requirements Planning
Message number: 182
Message text: No scheduling was carried out for the production quantities entered
In order to display a hierarchy graphic, you first have to branch to the
menu item Options - General and enter the name and plant of a hierarchy.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
CY182
- No scheduling was carried out for the production quantities entered ?The SAP error message CY182: No scheduling was carried out for the production quantities entered typically occurs in the context of production planning and scheduling within the SAP system. This error indicates that the system was unable to schedule the production order due to certain conditions not being met. Here are some common causes, potential solutions, and related information:
Causes:
Missing or Incorrect Master Data:
- The material master data or routing may be incomplete or incorrect.
- The production version may not be defined properly.
Capacity Constraints:
- Work centers may be overloaded or not available for the required time.
- The capacity planning settings may not allow for the scheduling of the order.
Production Order Status:
- The production order may be in a status that does not allow scheduling (e.g., "TECO" - Technically Completed).
Scheduling Parameters:
- The scheduling parameters in the production order may not be set correctly.
- The lead time or other scheduling parameters may be unrealistic.
Date Constraints:
- The start or finish dates of the production order may be in the past or not feasible.
Solutions:
Check Master Data:
- Verify that the material master, routing, and production version are correctly set up and complete.
- Ensure that the necessary BOM (Bill of Materials) is available.
Review Work Center Capacity:
- Check the capacity of the work centers involved in the production order.
- Adjust the capacity or reschedule the order to a time when capacity is available.
Change Production Order Status:
- If the order is in a status that prevents scheduling, change it to a status that allows scheduling (e.g., "REL" - Released).
Adjust Scheduling Parameters:
- Review and adjust the scheduling parameters in the production order.
- Ensure that the lead times and other relevant parameters are realistic.
Check Dates:
- Ensure that the start and finish dates of the production order are set correctly and are feasible.
Related Information:
CO01
(Create Production Order), CO02
(Change Production Order), and CO03
(Display Production Order) to manage production orders.If the issue persists after checking these areas, it may be beneficial to consult with your SAP support team or refer to SAP documentation for further troubleshooting steps.
Get instant SAP help. Start your 7-day free trial now.
CY181
Plant & does not exist
What causes this issue? In the general options screen, you have to enter the name and plant of a work center hierarchy when cumulating capacity requi...
CY180
The hierarchy & does not exist in plant &
What causes this issue? In the general options screen, you have to enter the name and the plant of a work center hierarchy in order to cumulate capac...
CY183
Specify a plant for the hierarchy &
What causes this issue? If you have entered the name of a hierarchy in the general options screen, you also have to specify a plant. Work center hie...
CY184
There are no operations for the selected work center
What causes this issue? The "operations per work center" graphic (GANTT chart) is only displayed if operations exist at a work center. If t...
Click on this link to search all SAP messages.