Do you have any question about this error?
Message type: E = Error
Message class: CY - Capacity Requirements Planning
Message number: 183
Message text: Specify a plant for the hierarchy &
If you have entered the name of a hierarchy in the general options
screen, you also have to specify a plant. Work center hierarchies are
always created for one plant.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
CY183
- Specify a plant for the hierarchy & ?The SAP error message CY183 ("Specify a plant for the hierarchy &") typically occurs in the context of SAP's Controlling (CO) module, particularly when dealing with cost center hierarchies or other organizational structures that require a plant specification.
Cause:
This error message indicates that the system requires a plant to be specified for a particular hierarchy, but it has not been provided. This can happen in various scenarios, such as:
- Missing Plant Assignment: The hierarchy you are trying to work with does not have an associated plant.
- Incorrect Configuration: The configuration settings for the hierarchy may not have been set up correctly, leading to the absence of a plant assignment.
- Data Entry Error: When entering data related to the hierarchy, the plant field may have been left blank.
Solution:
To resolve the CY183 error, you can take the following steps:
Check Hierarchy Settings:
- Navigate to the relevant configuration settings for the hierarchy in question.
- Ensure that a plant is assigned to the hierarchy. This can typically be done in the customizing settings under the Controlling module.
Assign a Plant:
- If the hierarchy is missing a plant assignment, you will need to assign a plant to it. This can usually be done in the transaction code related to the hierarchy (e.g., OKEQ for cost center hierarchy).
- Make sure to save your changes after assigning the plant.
Review Data Entry:
- If you are entering data manually, double-check that you have filled in all required fields, including the plant field.
- Ensure that the plant you are trying to assign is valid and exists in the system.
Consult Documentation:
- If you are unsure about the configuration or the process, refer to SAP documentation or help resources for guidance on setting up hierarchies and assigning plants.
Contact Support:
- If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.
Related Information:
By following these steps, you should be able to resolve the CY183 error and successfully specify a plant for the hierarchy in SAP.
Get instant SAP help. Start your 7-day free trial now.
CY182
No scheduling was carried out for the production quantities entered
What causes this issue? In order to display a hierarchy graphic, you first have to branch to the menu item Options - General and enter the name and p...
CY181
Plant & does not exist
What causes this issue? In the general options screen, you have to enter the name and plant of a work center hierarchy when cumulating capacity requi...
CY184
There are no operations for the selected work center
What causes this issue? The "operations per work center" graphic (GANTT chart) is only displayed if operations exist at a work center. If t...
CY185
Version & of the detailed list does not exist
What causes this issue? The version of the detailed capacity list you have selected to transfer data to a PC (EXCEL interface) does not exist.System ...
Click on this link to search all SAP messages.