Do you have any question about this error?
Message type: E = Error
Message class: CS - Logistics Customizing
Message number: 091
Message text: Enter different values for the priorities
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CS091
- Enter different values for the priorities ?The SAP error message CS091 ("Enter different values for the priorities") typically occurs in the context of creating or modifying a bill of materials (BOM) or a routing in SAP. This error indicates that there is a conflict with the priority values assigned to components or operations within the BOM or routing.
Cause:
The error arises when you attempt to assign the same priority value to multiple components or operations. In SAP, each component or operation in a BOM or routing must have a unique priority value to determine the order in which they are processed or used in production.
Solution:
To resolve the CS091 error, you need to ensure that each component or operation has a unique priority value. Here are the steps to do this:
- Review the BOM or Routing: Open the BOM or routing that is causing the error.
- Check Priority Values: Look at the priority values assigned to each component or operation. Identify any duplicates.
- Assign Unique Values: Change the priority values so that each one is unique. You can do this by incrementing the values or assigning new values that do not conflict with existing ones.
- Save Changes: After making the necessary adjustments, save the BOM or routing.
Related Information:
CS01
(Create BOM), CS02
(Change BOM), CA01
(Create Routing), or CA02
(Change Routing).If you continue to experience issues after ensuring unique priority values, consider checking for any system-specific configurations or consulting with your SAP support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
CS090
Warning: You are initializing the control indicator
What causes this issue? The initialization of the control indicator can make it impossible for you to access existing projects.System Response The s...
CS089
The versions must be unique
What causes this issue? Versions must be unique. Version &V1& already exists.How to fix this error? Enter another versionError message extra...
CS092
Enter a value that is not initial
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CS093
Versions with coding & still exist
What causes this issue? There aer still versions with the coding &V1& in the system. Therefore you cannot delete the version coding.System Re...
Click on this link to search all SAP messages.