Do you have any question about this error?
Message type: E = Error
Message class: CS - Logistics Customizing
Message number: 072
Message text: Changes to indicators can cause changes to the network or lib. netwrk
When you switch between general costs, internal or external processing,
this can cause changes in the (library) network.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
CS072
- Changes to indicators can cause changes to the network or lib. netwrk ?The SAP error message CS072 indicates that changes made to certain indicators in a bill of materials (BOM) or routing can lead to changes in the associated network or library network. This error typically arises in the context of production planning and control, where the integrity of the BOM and routing is crucial for accurate planning and execution.
Cause:
The error CS072 is triggered when:
- Changes to BOM or Routing: You have made changes to the BOM or routing that affect the production process, such as changing component quantities, adding or removing components, or modifying operation sequences.
- Network Dependencies: The changes you made may impact the existing production network or library network, which is used for scheduling and resource allocation.
- Indicator Changes: Specific indicators (like production version, status, or other relevant flags) have been altered, which can lead to inconsistencies in the production planning process.
Solution:
To resolve the CS072 error, consider the following steps:
- Review Changes: Go back and review the changes you made to the BOM or routing. Ensure that they are necessary and correctly implemented.
- Check Dependencies: Analyze the dependencies between the BOM/routing and the production network. Ensure that the changes do not conflict with existing network configurations.
- Recreate Network: If the changes are valid and necessary, you may need to recreate or adjust the production network to align with the new BOM or routing. This can involve:
- Deleting the existing network and creating a new one.
- Adjusting the existing network to accommodate the changes.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on handling BOM and routing changes in relation to networks.
- Testing: After making adjustments, test the changes in a development or test environment before applying them to the production environment to ensure that the error does not recur.
Related Information:
By following these steps, you should be able to address the CS072 error effectively and ensure that your production planning processes remain smooth and efficient.
Get instant SAP help. Start your 7-day free trial now.
CS071
You cannot set indicators for BOTH external processing AND gen. costs
What causes this issue? You set both the general costs and external processing indicators for the control key. This is not allowed. Either the acti...
CS070
The control key "&" is not valid.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CS073
Set the external processing indicator
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CS074
You cannot change the project structure indicator.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.