Do you have any question about this error?
Message type: E = Error
Message class: CRMS4_PS_CONTR - Messages for application controller
Message number: 039
Message text: Period begin or period end is not normalized
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CRMS4_PS_CONTR039
- Period begin or period end is not normalized ?The SAP error message CRMS4_PS_CONTR039 indicates that there is an issue with the period begin or period end dates in a project or service order context. This error typically arises when the dates provided do not conform to the expected format or range, which can lead to inconsistencies in project planning and reporting.
Cause:
- Non-Normalized Dates: The period begin or end dates may not be normalized, meaning they do not align with the defined fiscal periods or calendar settings in the system.
- Incorrect Date Format: The dates may be entered in an incorrect format or may not match the expected date type (e.g., date fields expecting a specific format).
- Fiscal Year Settings: The fiscal year settings in the system may not be configured correctly, leading to discrepancies in how periods are defined.
- Project Structure Issues: If the project structure is not set up correctly, it can lead to issues with the periods assigned to various project elements.
Solution:
- Check Date Entries: Verify that the period begin and end dates are entered correctly and conform to the expected format. Ensure that they fall within the valid range of dates for the project.
- Normalize Dates: If the dates are not normalized, adjust them to align with the defined fiscal periods. This may involve changing the dates to the start and end of the fiscal periods.
- Review Fiscal Year Settings: Check the fiscal year settings in the system to ensure they are configured correctly. This includes verifying the fiscal year variant and the associated periods.
- Project Structure Review: Ensure that the project structure is correctly set up and that all elements are assigned to the appropriate periods.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidelines on date normalization and fiscal period settings.
Related Information:
CJ20N
(Project Builder) or CJ02
(Change Project) to review and modify project details.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a technical consultant who can provide further assistance.
Get instant SAP help. Start your 7-day free trial now.
CRMS4_PS_CONTR038
Invalid period
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CRMS4_PS_CONTR037
No payment recipient number assigned to GPD item &1 (version ID &2)
What causes this issue? The gross payment document item &V1& (VersionID &V2&) has no payment recipient number assigned. The initial n...
CRMS4_PS_CONTR040
No external key for reimbursement set
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CRMS4_PS_CONTR041
No valid SSP specified
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.