How To Fix CRM_MKTHV_INFRASTRUC056 - High-volume execution is scheduled in bgRFC Scheduler &1


CRM_MKTHV_INFRASTRUC056 - Overview

  • Message type: E = Error

  • Message class: CRM_MKTHV_INFRASTRUC - high volume campaign execution infrastructure messages

  • Message number: 056

  • Message text: High-volume execution is scheduled in bgRFC Scheduler &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CRM_MKTHV_INFRASTRUC056 - High-volume execution is scheduled in bgRFC Scheduler &1 ?
    The SAP error message CRM_MKTHV_INFRASTRUC056 indicates that a high-volume execution is scheduled in the bgRFC (background Remote Function Call) Scheduler. This typically occurs in scenarios where a large number of background processing tasks are queued for execution, which can lead to performance issues or delays in processing.
    
    Cause: High Volume of Data: The error is often triggered when there is a significant amount of data that needs to be processed, leading to a backlog in the bgRFC queue. System Performance: If the system is under heavy load or if there are resource constraints (CPU, memory, etc.), it may not be able to process the bgRFC calls efficiently.
    Configuration Issues: Incorrect configuration of the bgRFC settings or insufficient resources allocated for background processing can also lead to this error.
    Solution: Monitor bgRFC Queue: Use transaction SM58 to monitor the status of the bgRFC queue. Check for any stuck or failed entries that may need to be addressed. Increase

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant