Do you have any question about this error?
Message type: E = Error
Message class: CRM_BILLPLAN_UBB - Messages for UBB Billing Plan
Message number: 552
Message text: Period change was not completed fully for pool contract &1
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CRM_BILLPLAN_UBB552
- Period change was not completed fully for pool contract &1 ?The SAP error message
CRM_BILLPLAN_UBB552
indicates that there was an issue with the period change process for a pool contract in the SAP Customer Relationship Management (CRM) system. This error typically arises when the system is unable to complete the necessary updates for billing plans associated with a contract.Cause:
The error can be caused by several factors, including but not limited to:
- Incomplete Data: Required data for the period change may be missing or incomplete.
- Configuration Issues: There may be configuration settings in the billing plan or contract that are not set up correctly.
- System Lock: The contract or related objects may be locked by another process, preventing the period change from being completed.
- Custom Code: If there are custom enhancements or modifications in the system, they may interfere with the standard process.
- Authorization Issues: The user may not have the necessary authorizations to perform the period change.
Solution:
To resolve the error, you can take the following steps:
- Check Data Completeness: Ensure that all required fields and data for the billing plan and contract are filled out correctly.
- Review Configuration: Verify the configuration settings for billing plans and contracts in the SAP system. Ensure that they align with the business requirements.
- Check for Locks: Use transaction codes like
SM12
to check for any locks on the contract or related objects. If locks are found, determine the cause and resolve it.- Review Logs: Check the application logs (transaction
SLG1
) for any additional error messages or warnings that may provide more context about the issue.- Test in a Development Environment: If you suspect custom code is causing the issue, test the period change in a development or quality assurance environment to isolate the problem.
- User Authorizations: Ensure that the user attempting the period change has the necessary authorizations to perform the action.
- Consult Documentation: Review SAP documentation or notes related to the error message for any specific recommendations or patches that may apply.
Related Information:
CRM_BILLPLAN
for billing plan management and CRM_CONTRACT
for contract management.CRM_BILLPLAN_UBB552
for potential fixes or updates.By following these steps, you should be able to identify and resolve the issue causing the CRM_BILLPLAN_UBB552
error message.
Get instant SAP help. Start your 7-day free trial now.
CRM_BILLPLAN_UBB551
Action cannot be executed; an action already exists for this date
What causes this issue? You tried to perform an action, such as a pool linkage. However, another action, such as the merging of periods due to missin...
CRM_BILLPLAN_UBB550
Pool redistribution is not synchronous with usage
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CRM_BILLPLAN_UBB553
Usage billing plan is not synchronized with pool billing plan
What causes this issue? You have adjusted the billing plan. This means that the usage billing plan is no longer synchronized with the distribution bi...
CRM_BILLPLAN_UBB554
Pool linkage of contract &1 is already scheduled
What causes this issue? Because a scheduled pool linkage already exists, it is not possible to make a period change for the billing plan on the selec...
Click on this link to search all SAP messages.