How To Fix CRM_BILLPLAN_UBB552 - Period change was not completed fully for pool contract &1


CRM_BILLPLAN_UBB552 - Overview

  • Message type: E = Error

  • Message class: CRM_BILLPLAN_UBB - Messages for UBB Billing Plan

  • Message number: 552

  • Message text: Period change was not completed fully for pool contract &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CRM_BILLPLAN_UBB552 - Period change was not completed fully for pool contract &1 ?
    The SAP error message CRM_BILLPLAN_UBB552 indicates that there was an issue with the period change process for a pool contract in the SAP Customer Relationship Management (CRM) system. This error typically arises when the system is unable to complete the necessary updates for billing plans associated with a contract.
    
    Cause: The error can be caused by several factors, including but not limited to: Incomplete Data: Required data for the period change may be missing or incomplete.
    Configuration Issues: There may be configuration settings in the billing plan or contract that are not set up correctly. System Lock: The contract or related objects may be locked by another process, preventing the period change from being completed. Custom Code: If there are custom enhancements or modifications in the system, they may interfere with the standard process. Authorization Issues: The user may not have the necessary authorizations to perform the period change.
    Solution: To resolve the error, you can take the following

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker