How To Fix CRM_BILLPLAN_UBB502 - No period (date details) available to split with your split date


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CRM_BILLPLAN_UBB - Messages for UBB Billing Plan

  • Message number: 502

  • Message text: No period (date details) available to split with your split date

  • Show details Hide details
  • What causes this issue?

    The system could not found a valid period to split. Possible the date to
    split is before or after a existing date period.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    Procedure for System Administrators


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CRM_BILLPLAN_UBB502 - No period (date details) available to split with your split date ?

    The SAP error message CRM_BILLPLAN_UBB502 indicates that there is no billing period available for the specified split date in the billing plan. This typically occurs when you are trying to process a billing document or a billing plan that requires a specific date for splitting, but the system cannot find a corresponding billing period that matches the criteria.

    Causes:

    1. Incorrect Split Date: The split date you are using does not fall within any defined billing periods in the billing plan.
    2. Missing Billing Periods: The billing plan may not have been set up correctly, or the billing periods may not have been defined for the relevant time frame.
    3. Date Configuration Issues: There may be configuration issues in the billing plan settings or the date settings in the system.
    4. Data Entry Errors: There could be a mistake in the data entry, such as entering an incorrect date or selecting the wrong billing plan.

    Solutions:

    1. Check Billing Plan Configuration:

      • Go to the billing plan configuration and verify that the billing periods are correctly defined for the relevant time frame.
      • Ensure that the split date you are trying to use falls within one of the defined billing periods.
    2. Adjust the Split Date:

      • If the split date is incorrect, adjust it to a date that falls within the available billing periods.
    3. Review Billing Plan Details:

      • Check the details of the billing plan to ensure that all necessary information is correctly entered and that there are no gaps in the billing periods.
    4. Consult Documentation:

      • Review SAP documentation or help resources related to billing plans and periods to ensure that you are following the correct procedures.
    5. Contact SAP Support:

      • If the issue persists after checking the above points, consider reaching out to SAP support for further assistance. They may provide insights specific to your system configuration.

    Related Information:

    • Transaction Codes: You may need to use transaction codes like CRMD_ORDER or VF01 to access billing documents and plans.
    • SAP Notes: Check for any relevant SAP Notes that might address known issues or provide patches related to billing plans.
    • User Roles and Authorizations: Ensure that you have the necessary authorizations to view and modify billing plans and periods.

    By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author