Do you have any question about this error?
Message type: E = Error
Message class: CRM_BILLPLAN_UBB - Messages for UBB Billing Plan
Message number: 501
Message text: The accrual date is not valid
No suitable entry could be selected for the selected delimitation date
(e.g. the date for a pool linkage).
The delimitation date is not valid.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Check whether the delimitation date is valid. For a pool linkage, for
example, the usage billing plan may be moved to the start of the
contract. In this case, it is not possible to perform pool linkage at
the start of the contract, but at the start of the usage billing plan.
Error message extract from SAP system. Copyright SAP SE.
CRM_BILLPLAN_UBB501
- The accrual date is not valid ?The SAP error message CRM_BILLPLAN_UBB501 indicates that the accrual date specified in a billing plan or related document is not valid. This error typically arises in the context of billing and invoicing processes within the SAP Customer Relationship Management (CRM) module.
Cause:
- Invalid Date: The accrual date may be set to a date that is not within the allowed range, such as a date in the past or a date that does not align with the billing cycle.
- Configuration Issues: There may be configuration settings in the billing plan or related documents that do not allow for the specified accrual date.
- Missing Data: Required fields or data related to the billing plan may be incomplete or missing, leading to the error.
- Document Status: The status of the document (e.g., if it is already processed or completed) may prevent changes to the accrual date.
Solution:
- Check the Accrual Date: Verify that the accrual date entered is valid and falls within the acceptable range for the billing plan. Ensure it aligns with the billing cycle.
- Review Billing Plan Configuration: Check the configuration settings for the billing plan to ensure that they allow for the specified accrual date. This may involve reviewing the billing plan type and its settings.
- Complete Required Fields: Ensure that all required fields in the billing plan or related document are filled out correctly. Look for any missing or incorrect data.
- Document Status: If the document is in a status that does not allow changes, consider changing the status or creating a new document with the correct accrual date.
- Consult Documentation: Refer to SAP documentation or help resources for specific details on the billing plan configuration and accrual date requirements.
Related Information:
CRM_BILLPLAN
to access and modify billing plans.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a technical consultant who can provide further assistance.
Get instant SAP help. Start your 7-day free trial now.
CRM_BILLPLAN_UBB500
* * * * User Interface * * *
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CRM_BILLPLAN_UBB406
No entry for the service type in table CRMV_BILP_SYNC
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CRM_BILLPLAN_UBB502
No period (date details) available to split with your split date
What causes this issue? The system could not found a valid period to split. Possible the date to split is before or after a existing date period.Syst...
CRM_BILLPLAN_UBB503
Error merging date lines in the billing plan
What causes this issue? You wanted to merge date lines in the billing plan. A technical error occurred, probably due to a program error.System Respon...
Click on this link to search all SAP messages.