How To Fix CRD_REQBUILD151 - Invalid call sequence in method &1 of requirements determination


CRD_REQBUILD151 - Overview

  • Message type: E = Error

  • Message class: CRD_REQBUILD - Credentialing: Generate Requirements

  • Message number: 151

  • Message text: Invalid call sequence in method &1 of requirements determination

  • Show details Hide details
  • What causes this issue?

    The <DS:GLOS.D5E1D85D66DDD3119B4F0060B0671ACC>determination</> of
    <DS:GLOS.44A21B945F2E4D36E10000000A114B08>requirements</> takes place as
    a series of defined steps in which the logic of the individual steps is
    interchangeable to a certain extent. Nevertheless, all the steps have to
    be performed in order to avoid inconsistencies.
    In the current case, the system is supposed to execute method &V1&
    without first executing method &V2& .

    System Response

    The program is canceled.

    How to fix this error?

    This exception should only occur if the SAP standard methods contain an
    error or have been incorrectly replaced by customer methods.
    Determine which of these two situations has occurred.
    In the first case, contact SAP support.
    In the second case, ask your system administrator to correct the local
    change of your installation.

    Procedure for System Administrators

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CRD_REQBUILD151 - Invalid call sequence in method &1 of requirements determination ?
    The SAP error message CRD_REQBUILD151 indicates an "Invalid call sequence in method &1 of requirements determination." This error typically occurs during the requirements determination process in SAP, which is part of the material planning and production planning modules. The error suggests that there is an issue with the sequence of method calls in the requirements determination logic.
    Causes:
    
    Incorrect Configuration: The configuration settings for the requirements determination process may be incorrect or incomplete.
    Custom Code Issues: If there are custom enhancements or modifications in the requirements determination logic, they may not be following the expected sequence of method calls.
    Data Issues: Inconsistent or missing data in the master data (like material master, BOM, or routing) can lead to this error.
    System Bugs: There may be bugs in the SAP system or specific patches that need to be applied.
    
    Solutions:
    
    Check Configuration: Review the configuration settings related to requirements determination in the SAP system. Ensure that all necessary

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker