Message type: E = Error
Message class: CR - (1,099) Work Center; (100,200) Capacity
Message number: 231
Message text: You can only assign a different superior resource in the graphic
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CR231
- You can only assign a different superior resource in the graphic ?The SAP error message CR231, "You can only assign a different superior resource in the graphic," typically occurs in the context of SAP Project System (PS) or SAP Controlling (CO) when you are trying to change the superior resource of a task or activity in a graphical representation, such as a network diagram or Gantt chart.
Cause:
This error usually arises due to one of the following reasons:
Incorrect Context: You may be trying to change the superior resource in a context where it is not allowed. For example, if you are in a mode that does not permit changes to the hierarchy or resource assignments.
Resource Assignment Restrictions: The system may have restrictions on changing superior resources based on the current status of the project or the specific settings in the project management configuration.
User Authorizations: The user may not have the necessary authorizations to make changes to the resource assignments.
Data Integrity Rules: SAP has built-in data integrity rules that prevent certain changes if they would violate the logical structure of the project or resource assignments.
Solution:
To resolve the CR231 error, you can try the following steps:
Check the Mode: Ensure that you are in the correct mode for making changes. If you are in a display mode, switch to edit mode.
Review Project Settings: Check the project settings and configurations to ensure that changing the superior resource is allowed. You may need to consult with your project manager or SAP administrator.
User Authorizations: Verify that you have the necessary authorizations to make changes to resource assignments. If not, contact your system administrator to obtain the required permissions.
Use Alternative Methods: If the graphical interface does not allow the change, consider using alternative methods, such as transaction codes (e.g., CJ20N for project management) to make the necessary adjustments.
Consult Documentation: Refer to SAP documentation or help resources for specific guidelines on resource assignment and project management.
Contact Support: If the issue persists, consider reaching out to SAP support or your internal IT support team for further assistance.
Related Information:
By following these steps, you should be able to address the CR231 error and successfully manage your project resources in SAP.
Get instant SAP help. Start your 7-day free trial now.
CR230
Resource & plant & not assigned to hierarchy & in plant &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CR229
Setting: Resource category & does not exist
What causes this issue? You are attempting to edit a resource with resource category &V1&. However, this is no longer possible for one of the...
CR232
Resource from HR already exists as & in plant &
What causes this issue? You want to create a resource by referencing a resource maintained in the Human Resources System. However, you have already r...
CR233
Resource capacity was deleted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.