How To Fix CPOC2514 - Document cancelled manually


CPOC2514 - Overview

  • Message type: E = Error

  • Message class: CPOC2 - PP-PI-PMA: PI Sheet Messages, SCM Add-On

  • Message number: 514

  • Message text: Document cancelled manually

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CPOC2514 - Document cancelled manually ?
    The SAP error message CPOC2514, which states "Document cancelled manually," typically occurs in the context of SAP Controlling (CO) or Project System (PS) modules. This message indicates that a document, such as a cost document or a project-related document, has been manually cancelled by a user, and as a result, certain operations or processes cannot be completed.
    
    Cause: Manual Cancellation: The document in question has been explicitly cancelled by a user, which may have been done for various reasons, such as correcting an error or adjusting project costs. Dependencies: Other processes or transactions that depend on this document may be affected, leading to this error when trying to perform further actions. Data Integrity: The cancellation may have violated data integrity rules or constraints within the system, preventing further processing.
    Solution: Check Document Status: Verify the status of the document in question. You can do this by navigating to the relevant transaction (e.g., CJI3 for project costs)

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker