Message type: E = Error
Message class: CPE - Commodity Pricing Engine
Message number: 109
Message text: End of fixed period has to be after start of fixed period
The end date of the fixed period comes before the start date.
The period is not properly defined.
Enter an end date that is either the same as the start date, or that
comes after the start date.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
CPE109
- End of fixed period has to be after start of fixed period ?The SAP error message CPE109, which states "End of fixed period has to be after start of fixed period," typically occurs in the context of managing fixed asset periods or planning periods in SAP. This error indicates that the end date of a fixed period is set before or on the same date as the start date, which is logically incorrect.
Cause: Incorrect Date Entry: The most common cause is that the user has entered the end date of a fixed period that is earlier than or the same as the start date. System Configuration: There may be issues with the configuration of the periods in the system, leading to inconsistencies. Data Migration Issues: If data has been migrated from another system, there may be incorrect date entries that need to be corrected.
Solution: Check Date Entries: Review the entries for the fixed period in question. Ensure that the end date is set to a date
Get instant SAP help. Sign up for our Free Essentials Plan.
CPE108
Specify start and end of fixed period
What causes this issue? The definition of the fixed period is incomplete.System Response Period determination using a fixed period can only take pla...
CPE107
Specify reference date routine for period determination
What causes this issue? The period determination rule for a flexible period was defined without a reference date routine.System Response The flexibl...
CPE110
Term type 30: Maintain all reference data
What causes this issue? The term calculation type 30 needs to reference a condition type of an existing document item. An entry required to do this i...
CPE111
Term type with ref.: no fixed term rate, term rule, or quotation data
What causes this issue? For a term calculation type with reference to another formula, data has been entered either for a fix term rate, a term rule,...
Click on this link to search all SAP messages.