Message type: E = Error
Message class: CPE - Commodity Pricing Engine
Message number: 108
Message text: Specify start and end of fixed period
The definition of the fixed period is incomplete.
Period determination using a fixed period can only take place with a
start and end date.
Enter a start and end date.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
CPE108
- Specify start and end of fixed period ?The SAP error message CPE108 ("Specify start and end of fixed period") typically occurs in the context of the SAP Controlling (CO) module, particularly when dealing with planning or reporting activities that require a defined time frame. This error indicates that the system requires you to specify a fixed period for the operation you are trying to perform, but it has not been provided.
Cause: Missing Date Range: The most common cause of this error is that the user has not specified the start and end dates for the fixed period in the planning or reporting transaction. Incorrect Configuration: There may be issues with the configuration of the planning layout or the report that does not allow for a fixed period to be defined. User Input Error: The user may have overlooked entering the required fields or may have entered them incorrectly.
Solution: Specify Dates: Ensure that you enter the start and end dates for the
Get instant SAP help. Sign up for our Free Essentials Plan.
CPE107
Specify reference date routine for period determination
What causes this issue? The period determination rule for a flexible period was defined without a reference date routine.System Response The flexibl...
CPE106
Define date offset routine
What causes this issue? The period determination rule was defined with a number of time units for the offset, but without a date offset routine.Syste...
CPE109
End of fixed period has to be after start of fixed period
What causes this issue? The end date of the fixed period comes before the start date.System Response The period is not properly defined.How to fix t...
CPE110
Term type 30: Maintain all reference data
What causes this issue? The term calculation type 30 needs to reference a condition type of an existing document item. An entry required to do this i...
Click on this link to search all SAP messages.