How To Fix /CPD/SS_MESSAGES298 - Activity Planning for Project &1: Only periods 001 to 012 are supported.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /CPD/SS_MESSAGES -

  • Message number: 298

  • Message text: Activity Planning for Project &1: Only periods 001 to 012 are supported.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /CPD/SS_MESSAGES298 - Activity Planning for Project &1: Only periods 001 to 012 are supported. ?
    The SAP error message /CPD/SS_MESSAGES298 indicates that there is an issue with activity planning for a project in SAP, specifically that only periods 001 to 012 (which typically correspond to January to December of a given year) are supported. This error usually arises when you attempt to plan activities for a period outside of the defined range, such as a period that is not part of the fiscal year or a period that is not configured in the system.
    
    Cause: Invalid Period: The period you are trying to use for activity planning is outside the supported range (e.g., period 013 for January of the next year). Fiscal Year Variant: The fiscal year variant may not be set up to allow for periods beyond 012.
    Configuration Issues: There may be configuration issues in the project management settings or the controlling area that restrict the periods available for planning.
    Solution: Check the Period: Verify the period you are

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author