Message type: E = Error
Message class: /CPD/SS_MESSAGES -
Message number: 297
Message text: Plan line type should be either U, D, or S; see the long text.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/CPD/SS_MESSAGES297
- Plan line type should be either U, D, or S; see the long text. ?The SAP error message /CPD/SS_MESSAGES297 indicates that there is an issue with the plan line type in your configuration or data entry. Specifically, the error states that the plan line type should be either 'U' (for Unit), 'D' (for Duration), or 'S' (for Standard). This error typically arises in the context of project planning or resource management within SAP.
Cause: Incorrect Line Type: The line type specified in your planning data is not one of the accepted values ('U', 'D', or 'S'). Data Entry Error: There may have been a typographical error or incorrect selection when entering the plan line type. Configuration Issue: The system may not be properly configured to recognize the line types, or there may be a missing or incorrect mapping in the configuration settings.
Solution: Check the Plan Line Type: Review the data entry where the error occurred and ensure that the plan line type is set to one of the valid
Get instant SAP help. Sign up for our Free Essentials Plan.
/CPD/SS_MESSAGES296
Resource &1 is not active in &2 &3.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/CPD/SS_MESSAGES295
Could not determine the cost center for employee &1.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/CPD/SS_MESSAGES298
Activity Planning for Project &1: Only periods 001 to 012 are supported.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/CPD/SS_MESSAGES299
Service quantity is relevant only for service-based work packages.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.