Do you have any question about this error?
Message type: E = Error
Message class: /CPD/SS_MESSAGES -
Message number: 196
Message text: A project ID cannot begin with this character.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/CPD/SS_MESSAGES196
- A project ID cannot begin with this character. ?The SAP error message
/CPD/SS_MESSAGES196
indicates that there is an issue with the project ID you are trying to use. Specifically, the error states that a project ID cannot begin with a certain character, which is typically a special character or a space.Cause:
- Invalid Character: The project ID you are trying to create or use starts with a character that is not allowed. This could be a special character (like
@
,#
,$
, etc.) or a space.- Configuration Settings: The system may have specific rules or configurations that restrict the characters that can be used in project IDs.
Solution:
- Change the Project ID: Modify the project ID to ensure it starts with a valid character. Typically, project IDs should start with an alphanumeric character (A-Z, 0-9).
- Check Naming Conventions: Review the naming conventions for project IDs in your organization or system documentation to ensure compliance.
- Consult System Configuration: If you have access, check the configuration settings in SAP that define valid characters for project IDs. This may require assistance from your SAP administrator or technical team.
Related Information:
If the issue persists after making the necessary changes, consider reaching out to your SAP support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/CPD/SS_MESSAGES195
Cannot save more than 5 skills.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/CPD/SS_MESSAGES194
Skill &1 exceeds the limit of 40 characters.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/CPD/SS_MESSAGES197
Cannot proceed; project ID &1 contains special characters or spaces.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/CPD/SS_MESSAGES198
The end date of project &1 is earlier than the start date.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.