How To Fix /CPD/SS_MESSAGES021 - Cost element and activity type not maintained in &1


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /CPD/SS_MESSAGES -

  • Message number: 021

  • Message text: Cost element and activity type not maintained in &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /CPD/SS_MESSAGES021 - Cost element and activity type not maintained in &1 ?

    The SAP error message /CPD/SS_MESSAGES021 indicates that a cost element and activity type are not maintained in the specified object (denoted by &1). This error typically arises in the context of controlling (CO) or project systems (PS) when trying to perform operations that require a valid cost element and activity type configuration.

    Cause:

    1. Missing Configuration: The cost element or activity type has not been defined in the system for the specified object (e.g., cost center, internal order, project).
    2. Incorrect Assignment: The cost element or activity type may not be correctly assigned to the relevant controlling area or may not be valid for the specific transaction.
    3. Data Inconsistency: There may be inconsistencies in the master data or configuration settings that prevent the system from recognizing the cost element or activity type.

    Solution:

    1. Check Configuration:

      • Go to the configuration settings in SAP and verify that the cost element and activity type are properly defined.
      • Use transaction codes like KA01 (Create Cost Element) or KA02 (Change Cost Element) to check the cost element settings.
      • Use transaction code KP26 (Maintain Activity Type) to check the activity type settings.
    2. Maintain Cost Element and Activity Type:

      • If the cost element or activity type is missing, create it using the appropriate transaction codes.
      • Ensure that the cost element is assigned to the correct cost center or internal order.
    3. Check Assignment:

      • Ensure that the cost element is assigned to the correct controlling area.
      • Verify that the activity type is assigned to the relevant cost center or internal order.
    4. Review Master Data:

      • Check the master data for the cost center, internal order, or project to ensure that all necessary fields are filled out correctly.
      • Use transaction codes like KS01 (Create Cost Center) or KO01 (Create Internal Order) to review and maintain master data.
    5. Consult Documentation:

      • Refer to SAP documentation or help files for specific details on the configuration and requirements for cost elements and activity types.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes for managing cost elements and activity types, such as KA01, KA02, KP26, KS01, KO01, etc.
    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message.
    • User Roles and Authorizations: Ensure that the user has the necessary authorizations to create or modify cost elements and activity types.

    By following these steps, you should be able to resolve the error message /CPD/SS_MESSAGES021 and ensure that the cost element and activity type are properly maintained in the system.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant