How To Fix /CPD/PFP_SC_MESSAGES000 - &1: Acty element & 2 has early start date that is before plan start date


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /CPD/PFP_SC_MESSAGES -

  • Message number: 000

  • Message text: &1: Acty element & 2 has early start date that is before plan start date

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /CPD/PFP_SC_MESSAGES000 - &1: Acty element & 2 has early start date that is before plan start date ?

    The SAP error message /CPD/PFP_SC_MESSAGES000 &1: Activity element &2 has early start date that is before plan start date typically occurs in the context of project management or planning within SAP, particularly when dealing with project structures, scheduling, or resource planning.

    Cause:

    This error indicates that there is a mismatch between the start date of a specific activity (activity element) and the overall planned start date of the project or planning element. Specifically, it means that the activity is scheduled to start before the project or planning element is officially set to begin. This can happen due to:

    1. Incorrect Date Entries: The start date for the activity was entered incorrectly.
    2. Changes in Project Dates: The overall project start date may have been changed after the activity was created, leading to inconsistencies.
    3. Dependencies and Constraints: There may be dependencies or constraints that have not been properly set, causing the activity to be scheduled incorrectly.

    Solution:

    To resolve this error, you can take the following steps:

    1. Check Activity Dates:

      • Navigate to the activity in question and verify its start date.
      • Ensure that the start date of the activity is not earlier than the planned start date of the project or planning element.
    2. Adjust Dates:

      • If the activity's start date is indeed earlier than the planned start date, adjust the activity's start date to align with the project’s planned start date.
      • Alternatively, if the project start date needs to be adjusted, ensure that it reflects the correct timeline for the project.
    3. Review Project Settings:

      • Check the overall project settings to ensure that the planned start date is set correctly.
      • Make sure that any changes to the project timeline are reflected in all related activities.
    4. Dependencies and Constraints:

      • Review any dependencies or constraints associated with the activity to ensure they are set correctly and do not conflict with the project timeline.
    5. Consult Documentation:

      • If you are unsure about the correct dates or how to adjust them, consult the project management documentation or SAP help resources for guidance.
    6. Testing:

      • After making adjustments, test the changes to ensure that the error message no longer appears and that the project schedule is functioning as intended.

    Related Information:

    • SAP Modules: This error is often encountered in modules related to Project System (PS), Production Planning (PP), or other planning-related modules.
    • Transaction Codes: You may need to use transaction codes such as CJ20N (Project Builder) or CJI3 (Project Actual/Plan/Variance) to view and edit project details.
    • User Roles: Ensure that you have the necessary permissions to make changes to project dates and activities.

    If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in project management within SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author