Do you have any question about this error?
Message type: E = Error
Message class: /CPD/PFP_MESSAGES -
Message number: 711
Message text: &1: Plan revenue for &2 imported
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/CPD/PFP_MESSAGES711
- &1: Plan revenue for &2 imported ?The SAP error message
/CPD/PFP_MESSAGES711 &1: Plan revenue for &2 imported
typically relates to issues with planning revenue in the context of SAP's Profitability Analysis (CO-PA) or similar modules. This error indicates that there is a problem with the import of planned revenue data for a specific entity or period.Cause:
- Data Import Issues: The error may arise if there are inconsistencies or errors in the data being imported. This could be due to incorrect formats, missing fields, or invalid values.
- Configuration Issues: There may be configuration settings in the system that are not aligned with the data being imported, such as missing characteristics or key figures.
- Authorization Issues: The user may not have the necessary authorizations to perform the import operation.
- Data Consistency: There could be issues with data consistency in the target system, such as missing master data or incorrect settings in the planning area.
Solution:
- Check Data Format: Ensure that the data being imported is in the correct format and adheres to the required structure. Validate the data for any inconsistencies or errors.
- Review Configuration: Check the configuration settings in the SAP system related to planning and profitability analysis. Ensure that all necessary characteristics and key figures are defined and correctly set up.
- Authorization Check: Verify that the user performing the import has the necessary authorizations to execute the operation. If not, adjust the user roles or permissions accordingly.
- Data Consistency Check: Ensure that all required master data is available and consistent in the target system. This includes checking for any missing or incorrect entries in the relevant tables.
- Log Analysis: Review the application logs or error logs for more detailed information about the error. This can provide insights into what specifically went wrong during the import process.
- Consult Documentation: Refer to SAP documentation or notes related to the specific error message for additional troubleshooting steps or known issues.
Related Information:
KP06
(for planning) or KPF6
(for planning data import) to navigate the planning functionalities effectively.If the issue persists after following these steps, it may be beneficial to reach out to SAP support for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/CPD/PFP_MESSAGES710
&1: Plan cost for &2 imported
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/CPD/PFP_MESSAGES709
Enter a cut-off date after &1.
What causes this issue? You have entered a cut-off date for which day-wise actual postings or records are no longer available as individual records f...
/CPD/PFP_SC_MESSAGES000
&1: Acty element & 2 has early start date that is before plan start date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/CPD/PFP_SC_MESSAGES001
&1: Acty element & 2 has early finish date that is after plan finish date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.