How To Fix /CPD/PFP_MESSAGES342 - Plan type changed


/CPD/PFP_MESSAGES342 - Overview

  • Message type: E = Error

  • Message class: /CPD/PFP_MESSAGES -

  • Message number: 342

  • Message text: Plan type changed

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /CPD/PFP_MESSAGES342 - Plan type changed ?
    The SAP error message /CPD/PFP_MESSAGES342 Plan type changed typically occurs in the context of SAP's Project Management or Project System modules, particularly when dealing with planning and budgeting. This error indicates that there has been a change in the plan type associated with a project or a planning element, which can lead to inconsistencies in the data.
    
    Cause: Change in Plan Type: The most common cause of this error is that the plan type for a project or planning element has been modified after the initial planning was done. This can happen due to configuration changes or updates in the project structure. Data Inconsistency: If there are inconsistencies in the planning data, such as different plan types being used for different elements of the same project, this error may be triggered. User Actions: Sometimes, user actions such as changing the project settings or plan types in the system can lead to this error.
    Solution: Check Plan

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker