Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: CPCL_VERS - Task List Version
Message number: 112
Message text: Plant of version MBOM is not filled
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CPCL_VERS112
- Plant of version MBOM is not filled ?The SAP error message CPCL_VERS112 indicates that the plant of the version of the Manufacturing Bill of Materials (MBOM) is not filled. This error typically occurs when you are trying to create or modify a manufacturing bill of materials (BOM) and the system requires a plant assignment that has not been provided.
Cause:
- Missing Plant Assignment: The most common cause of this error is that the plant field in the BOM version is not filled in the relevant configuration or master data.
- Incorrect Configuration: The BOM version may not be properly configured to include a plant, or the plant may not be valid for the BOM being processed.
- Data Inconsistency: There may be inconsistencies in the data related to the BOM or the plant that is being referenced.
Solution:
- Check BOM Version: Go to the BOM version in the SAP system and ensure that the plant field is filled. You can do this by navigating to the BOM transaction (e.g., CS01, CS02) and checking the details of the BOM version.
- Create/Update BOM: If the plant is missing, you can create a new BOM version or update the existing one to include the appropriate plant.
- Validate Plant Data: Ensure that the plant you are trying to use is valid and active in the system. You can check this in the plant master data (transaction code OX10).
- Check Configuration Settings: Review the configuration settings for BOMs in your SAP system to ensure that they are set up correctly to require a plant assignment.
- Consult Documentation: If you are unsure about the process, refer to SAP documentation or help resources for guidance on BOM creation and management.
Related Information:
By following these steps, you should be able to resolve the CPCL_VERS112 error and successfully manage your BOMs in SAP.
Get instant SAP help. Sign up for our Free Essentials Plan.
CPCL_VERS111
Key of the version MBOM is not filled
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CPCL_VERS110
Material of version MBOM is not filled
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CPCL_VERS113
Inherited node number of BOM item is not filled
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CPCL_VERS114
Link between version &1 and change record does not yet exist
What causes this issue? The version profile specifies that a change record is required for the routing. However, no change record has been maintained...
Click on this link to search all SAP messages.