Do you have any question about this error?
Message type: E = Error
Message class: CPCL - Service Layer for Plans, Sequences, Operations, and Subober.
Message number: 224
Message text: Consistency check when assigning operation & to sequence & failed
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CPCL224
- Consistency check when assigning operation & to sequence & failed ?The SAP error message CPCL224 indicates that there is a consistency check failure when trying to assign an operation to a sequence in a production order or a similar context. This error typically arises in the context of production planning and control (PP) or project systems (PS) when there are discrepancies in the data related to operations and sequences.
Causes of CPCL224 Error
- Data Inconsistency: The operation you are trying to assign may not be compatible with the sequence due to missing or incorrect data.
- Incorrect Sequence Definition: The sequence may not be defined correctly, or the operation may not be valid for the specified sequence.
- Missing Dependencies: There may be missing dependencies or prerequisites that need to be fulfilled before the operation can be assigned to the sequence.
- Status Issues: The status of the operation or sequence may not allow for the assignment (e.g., if the operation is already completed or the sequence is locked).
- Configuration Issues: There may be configuration settings in the system that prevent the assignment due to business rules or constraints.
Solutions to CPCL224 Error
- Check Data Consistency: Review the operation and sequence data for any inconsistencies. Ensure that all required fields are filled out correctly.
- Validate Sequence Definition: Ensure that the sequence is defined correctly and that the operation is valid for that sequence. You may need to check the sequence settings in the configuration.
- Review Dependencies: Check if there are any dependencies that need to be fulfilled before the operation can be assigned. This may include checking for preceding operations or required materials.
- Check Status: Verify the status of both the operation and the sequence. If either is in a status that does not allow for changes, you may need to change the status before proceeding.
- Consult Configuration Settings: Review the configuration settings related to production orders or project systems to ensure that there are no rules preventing the assignment.
- Use Transaction Codes: Utilize relevant transaction codes (like CO02 for production orders) to check the details of the operation and sequence.
Related Information
By following these steps, you should be able to identify the root cause of the CPCL224 error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
CPCL223
Operation is not loaded
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CPCL222
Operation sequence invalid or not loaded
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CPCL225
Operation &1 in sequence &2 is not permitted
What causes this issue? You want to assign an operation with the number <(>&<)>1& to sequence <(>&<)>2&. Thi...
CPCL226
Operation dependencies cannot be updated
What causes this issue? You have assigned dependencies to an operation or changed existing dependencies.System Response The object dependencies were...
Click on this link to search all SAP messages.