Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix CPCL222 - Operation sequence invalid or not loaded


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CPCL - Service Layer for Plans, Sequences, Operations, and Subober.

  • Message number: 222

  • Message text: Operation sequence invalid or not loaded

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CPCL222 - Operation sequence invalid or not loaded ?

    The SAP error message CPCL222, which states "Operation sequence invalid or not loaded," typically occurs in the context of production planning and control, particularly when dealing with routing and operations in the SAP system. This error indicates that the operation sequence defined in the routing is either not valid or has not been properly loaded into the system.

    Causes:

    1. Invalid Operation Sequence: The operation sequence defined in the routing may not match the expected sequence for the production order or may have been altered.
    2. Routing Not Loaded: The routing for the material may not have been loaded into the production order, or the routing may not exist for the specific material or plant.
    3. Changes in Routing: If there have been recent changes to the routing, the production order may not reflect these changes, leading to inconsistencies.
    4. Missing or Incorrect Configuration: There may be missing configuration settings in the production planning module that affect how operations are sequenced and loaded.

    Solutions:

    1. Check Routing: Verify that the routing for the material is correctly defined and that the operation sequence is valid. You can do this by navigating to the routing in the SAP system and checking the operation details.
    2. Load Routing: Ensure that the routing is properly loaded into the production order. You can do this by using transaction codes like CO01 (Create Production Order) or CO02 (Change Production Order) to check the routing assignment.
    3. Review Changes: If there have been recent changes to the routing, ensure that the production order is updated to reflect these changes. You may need to reassign the routing to the production order.
    4. Check Configuration: Review the configuration settings in the production planning module to ensure that they are set up correctly. This may involve checking the settings for routing and operation sequences.
    5. Consult Documentation: Refer to SAP documentation or help resources for specific details related to the error message and its resolution.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CA01 (Create Routing), CA02 (Change Routing), CO01 (Create Production Order), and CO02 (Change Production Order).
    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message.
    • User Roles and Authorizations: Ensure that the user has the necessary authorizations to access and modify routing and production order data.
    • Testing: After making changes, perform testing to ensure that the error does not recur and that the production order processes correctly.

    If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning and control.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant